You will make hundreds of decisions on the way to a custom home. Our process puts them in the right order, so each one gets made on paper with real numbers in front of you, long before it can slow down a job site.
It is the path from an idea to a finished house: choosing a lot, designing the home, pricing it, permitting it, building it and handing you the keys. For most central Virginia families it takes about 10 to 14 months from the first conversation to move-in, with construction itself running 6 to 9 of those months. Our custom home building timeline breaks down how long each phase takes.
If you already own land, start with building on your lot. If you are still setting a budget, see what it costs to build a custom home in Virginia.
Every home we build is different. The order of operations is not. We answer your questions up front, connect you with lenders who know construction loans, design the home around your land and your budget, and keep you updated from groundbreaking to final walkthrough.
Call us or send a note. We talk through what you want to build, what you want to spend and whether you have land yet. There is no cost and no obligation, and you leave with a realistic sense of whether your plan fits your budget.
We evaluate your lot, draw and refine the plans, and start your selections. Every choice you make here, from the floor plan to the flooring, is one that never has to stop work on the job site later.
You get final numbers, allowances and a clear scope of work before anything is signed. This is also when construction financing closes, so we point you to our financing options early.
We handle permits, sitework, well and septic or utility hookups, and the first pass of the excavator. County permit offices and site conditions set the pace here, which is why we plan for them from day one.
Foundation, framing, roof, mechanicals, insulation, drywall, trim, paint and floors. This is the longest phase. You can reach us any time, and we schedule walkthroughs at key milestones so you always know where your home stands.
Final inspections, a detailed walkthrough together and a punch list we close out before you move in. We never rush to closing, because anything caught here is something you never have to call us about later.
For most central Virginia builds, about 10 to 14 months from the first conversation to move-in. Construction itself usually runs 6 to 9 months. Permits, site conditions and how quickly selections get made decide where you land in that range.
No. We walk candidate lots with serious buyers before they buy, so you know what site work a parcel needs before you commit to it.
Some changes are possible, but they add cost and time. The best time to decide is during discovery and design, while everything is still on paper.
Most of our clients use a construction-to-permanent loan. One closing covers the build, then it converts to a standard mortgage when the home is finished.
How many Pendants over the kitchen island? What size Chandelier in the Foyer? The Dining Room? The Family Room? These are the questions that keep
Press Release October 19, 2020 Fredericksburg, VA. – Built Right Homes, LLC is proud to announce that our Builder/Owner, Brandon Serbay has been awarded the
“The word SUPERIOR describes the high quality of work Brandon performed on every square inch of our dream home.”